Home
loading content

2:1 Polyolefin Tubing

20 items

dunbar-dc-221-1-1/2in
Expanded I.D. (in)1.50, 1.5in
Recovered I.D. (in)0.75, 0.75in
Size (in)1 1/2, 1.5in
Temperature Rating125C
Voltage600
Starting at 1.34 per FT Lead Time: 10 days
dunbar-dc-221-1-1/4in
Expanded I.D. (in)1.25, 1.25in
Recovered I.D. (in)0.63, 0.63in
Size (in)1 1/4, 1-1/4in
Temperature Rating125C
Voltage600
Starting at 0.99 per FT Lead Time: 10 days
dunbar-dc-221-1/16in
Expanded I.D. (in)0.063, 0.063in
Recovered I.D. (in)0.031, 0.031in
Size (in)1/16, 1/16in
Temperature Rating125C
Voltage600
Starting at 0.05 per FT Lead Time: 10 days
dunbar-dc-221-1/2in
Expanded I.D. (in)0.5, 0.5in
Recovered I.D. (in)0.25, 0.25in
Size (in)1/2, 1/2in
Temperature Rating125C
Voltage600
Starting at 0.17 per FT Lead Time: 10 days
dunbar-dc-221-1/4in
Expanded I.D. (in)0.25, 0.25in
Recovered I.D. (in)0.125, 0.125in
Size (in)1/4, 1/4in
Temperature Rating125C
Voltage600
Starting at 0.10 per FT Lead Time: 10 days
dunbar-dc-221-1/8in
Expanded I.D. (in)0.125, 0.125in
Recovered I.D. (in)0.062, 0.062in
Size (in)1/8, 1/8in
Temperature Rating125C
Voltage600
Starting at 0.06 per FT Lead Time: 10 days
dunbar-dc-221-1in
Expanded I.D. (in)1, 1in
Recovered I.D. (in)0.5, 0.5in
Size (in)1, 1in
Temperature Rating125C
Voltage600
Starting at 0.62 per FT Lead Time: 10 days
dunbar-dc-221-2in
Expanded I.D. (in)2, 2in
Recovered I.D. (in)1, 1in
Size (in)2, 2in
Temperature Rating125C
Voltage600
Starting at 1.63 per FT Lead Time: 10 days